System solution

Urban mobility

More and more cities have to deal with major traffic problems. However, the demands placed on modern urban management are high: no congested streets, hardly any noise, little air pollution, integration into existing architecture and, at the same time, investments should not be blasted. One of the solutions is to shift traffic to the air.

Our process

Marketing, Sales

Project planning, rope calculation

  • Developing plant concepts
  • Rope calculations and length profiles
  • Layout of stations and garages

Engineering

  • 40 own engineers and designers
  • closest exchange of information thanks to in-house production

Production in Flums

  • extensive machinery
  • state-of-the-art machine tools
  • 3-shift production on six days
  • Own vehicle production in new building

Pre-assembly in Flums

  • complete "in-house" pre-assembly
  • comprehensive function and quality control
  • also active as general contractor

Transport

  • Transport in Modules
  • partly in cooperation with special transport companies

Assembly on site

Acceptance by public authorities

After Sales Service by the Bartholet Service Center

Here are our references in the urban area

Funicular railway in Vadistanbul, Turkey

41.10773, 28.988553

Group lift in Druskininkai, Lithuania

54.032397, 23.961573

Aerial tramway in Vetruse, Czechia

50.655335, 14.039343

Aerial tramway in Durango, Mexico

24.028339, -104.65339

Aerial tramway in Puebla, Mexico

19.041008, -98.20876

Aerial tramway in Brest, France

48.388578, -4.497508

Téléporté Mixte 4/8 in Moscow, Russia

55.713624, 37.550972

Our top references

Top Referenz
Further information about the TPM 4/8 in the middle of Moscow